Quality Control

Factory-level QC for reliable field performance

Reliability matters more than a one-time low price. We control quality from selection to delivery.

Quality control inspection of airend

Five-stage quality control system

From machine selection and configuration confirmation to pre-shipment inspection, every step is documented to ensure reliable performance on overseas jobsites.

STAGE 01

Component Selection

Branded airends, IE3 motors and proven hydraulic components.

STAGE 02

Configuration Confirmation

Customer working condition matched against equipment configuration.

STAGE 03

Pre-Shipment Inspection

Engine performance, hydraulic system, structural strength, operating condition and appearance.

STAGE 04

Reinforced Export Packing

Wooden case, fumigation treatment, moisture protection and container fixing.

STAGE 05

Documentation & Certification

Test reports, COA, packing list, BL and certificate of origin.

Standards & certifications

Our equipment and pressure vessels are produced and tested according to recognized international and domestic standards.

ISO 9001
CE
ASME
PED
GB150
GOST
SGS
CCC
EAC
SASO
CO
FORM E
Request QC Documents